GES released the 2026/27 academic calendar. Single-track SHS resumes 18 September. Nine weeks from today.
For most proprietors, July is still vacation — the mental dial turns to rest, personal matters, whatever building work didn't get done during term. That's understandable. But September is not a soft deadline. Opening day arrives whether or not you are ready for it, and the two weeks before reopening are the worst possible time to discover that a classroom needs a new roof, that you have three unfilled teaching positions, or that forty families haven't confirmed re-enrollment.
The schools that open smoothly in September did most of their work in July and August. Not because they worked harder. Because they ran three tracks in parallel — facilities, admissions, staffing — and started while there was still time to course-correct.
The 9-Week Vacation Plan
Three tracks. One concrete action per track, per week. Starting now.
Track 1 — Facilities
Weeks 1–3: Walk every classroom, toilet, and common area. Write down what needs fixing, cleaning, or replacing. Get quotes. Prioritise by "unsafe or unusable by 18 September." The walk you do in July costs nothing. The emergency repairs you commission in September cost twice as much and take twice as long to complete.
Weeks 4–6: Works in progress. One check per week that contractors are on schedule. Not a call — a visit.
Weeks 7–9: Final clean, furniture arranged, notice boards updated. Done before the last week so staff re-entry isn't chaotic on top of everything else.
Track 2 — Admissions Pipeline
Weeks 1–2: Pull the current enrolled list. Flag every family that hasn't yet confirmed return for the new term. This is not a bill; it's a "we're looking forward to seeing Kofi in September" message. Families will confirm, or quietly tell you they're moving — both answers are useful now, when you can still fill the space.
Weeks 3–5: Open the door for new inquiries. Tell current parents: "We have a few spaces left — you can refer a family before [specific date]." A referral in July is an enrolled student in September. The same conversation in week 8 is a paperwork scramble.
Weeks 6–9: Close the intake list, issue the fee structure for the new term, confirm dates in writing.
Track 3 — Staffing
Week 1: Know who is coming back. A direct message to each member of staff: "Are you returning in September? We need to confirm by [specific date]." Not an assumption. A question with a deadline.
Weeks 2–4: For any gap — a teacher not returning, a role that needs filling — start the search now. The teaching job market in August is difficult. Good candidates who were available in July are gone by mid-August.
Weeks 5–7: Offer letters, salary confirmations, timetable conversations done. Staff meeting dates set for orientation week.
Weeks 8–9: Final confirmation. Who is in the building on 14 September — one week before SHS reopening — for orientation and classroom setup.
Why the three tracks matter together
Proprietors don't lose September to bad luck. They lose it because the three tracks look independent. Facilities looks like a contractor problem. Admissions looks like a numbers problem. Staffing looks like an HR problem. Managed separately, in the background, they converge in August as one emergency.
Running them in parallel — starting now — is what keeps them from converging.
The staffing track is the most time-sensitive of the three. A staff member who did good work last year and didn't hear from you in July hasn't necessarily resigned — but they've started listening to conversations they would have ignored in June. The cost of a direct question this week is ten minutes. The cost of not asking is measurable in August.
As a school grows to sixty, eighty, a hundred students and beyond, tracking the three tracks manually across nine weeks becomes the job in itself. Schools that have found a way to keep the pipeline visible — which families confirmed, which staff responded, what works are outstanding — stop treating reopening as an emergency every year. That shift starts with a plan; the question is whether the plan is on paper or in a system.